Snagging is the careful walk-through of a new or renovated property to spot faults the builder must put right: cracked tiles, doors that stick, poor paintwork, leaking taps, missing grout, loose fittings, blocked drains. Each fault is a snag, and the written record is the snag list.
When and how it is done
The first snag inspection normally happens just before or at practical completion, ahead of handover. Buyers can do it themselves with a checklist, but many use a building inspector, quantity surveyor or engineer who knows what to look for behind the finishes, such as uneven slabs, poor falls on a roof, or weak water pressure. Photographs, room-by-room notes and agreed deadlines make the list easier to enforce.
The developer or contractor then returns to fix the items, and a second inspection confirms they are done. Problems that appear later are usually dealt with under the defects liability period or developer’s warranty, if the contract provides one.
Why it matters
In Jamaican off-plan sales the buyer’s leverage is strongest before the final payment is released. Ask your attorney whether the agreement for sale lets you note snags at handover and whether any sum can be held back until they are cleared. Heat, humidity and heavy rain can reveal issues quickly, so keep a list during the first rainy season too.
Related terms: Practical Completion, Handover, Developer’s Warranty, Home inspection, Latent Defect, Defect log.
Accurate as at October 2026.
